Abu Bakar, M. Z., Gertsch, L. S., & Rostami, J. (2014). Evaluation of fragments from disc cutting of dry & saturated sandstone. Rock mechanics & rock engineering, 47, 1891-1903.
Anvari, A. A., Katibeh, H., & Sharifzade, M. (2010). A new approach for computing permeability of fault zones case study: the upper reservoir of Azad pumped-storage power station in Iran. Archives of mining Sciences, 55(3), 605-621
Cardu, M., Iabichino, G., Oreste, P., & Rispoli, A. (2017). Experimental & analytical studies of the parameters influencing the action of TBM disc tools in tunnelling. Acta Geotechnica, 12, 293-304.
Cigla, M., Yagiz, S., & Ozdemir, L. (2001, June). Application of tunnel boring machines in underground mine development. In 17th international mining congress & exhibition of Turkey (pp. 155-164(
Duan, W., Zhang, L., Zhang, M., Su, Y., Mo, J., & Zhou, Z. (2022). Numerical & experimental studies on the effects of the TBM cutter profile on rock cutting. KSCE Journal of Civil Engineering, 26, 416-432.
Emmanuel, D. A. D. A., JOSEPH, S., OYEWOLA, D., FADELE, A. A., & CHİROMA, H. (2021). Application of grey wolf optimization algorithm: Recent trends, issues, & possible horizons. Gazi University Journal of Science, 35(2), 485-504.
Farrokh, E. (2021). Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration & TBM advance. Arabian Journal of Geosciences, 14(19), 2049.
Farrokh, E. (2022). Lace Design Optimization for Hard Rock TBMs. Amirkabir Journal of Civil Engineering, 53(12), 5517-5534.
Geng, Q., Bruland, A., & Macias, F. J. (2018). Analysis on the relationship between layout & consumption of face cutters on hard rock tunnel boring machines (TBMs). Rock Mechanics & Rock Engineering, 51, 279-297.
Gertsch, R., Gertsch, L., & Rostami, J. (2007). Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction. International Journal of rock mechanics & mining sciences, 44(2), 238-246.
Gong, Q. M., Jiao, Y. Y., & Zhao, J. (2006b). Numerical modelling of the effects of joint spacing on rock fragmentation by TBM cutters. Tunnelling & Underground Space Technology, 21(1), 46-55.
Gong, Q. M., Zhao, J., & Hefny, A. M. (2006a). Numerical simulation of rock fragmentation process induced by two TBM cutters & cutter spacing optimization. Tunnelling & Underground Space Technology incorporating Trenchless Technology Research, 21(3), 263-263.
Gong, Q. M., Zhao, J., & Jiao, Y. Y. (2005). Numerical modeling of the effects of joint orientation on rock fragmentation by TBM cutters. Tunnelling & underground space technology, 20(2), 183-191.
Huo, J., Sun, W., Chen, J., Su, P., & Deng, L. (2010). Optimal disc cutters plane layout design of the full-face rock tunnel boring machine (tbm) based on a multi-objective genetic algorithm. Journal of Mechanical Science & Technology, 24, 521-528.
Huo, J., Sun, W., Chen, J., & Zhang, X. (2011). Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns. Computers & industrial engineering, 61(4), 1209-1225.
Huo, J., Wu, H., Yang, J., Sun, W., Li, G., & Sun, X. (2015). Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test. Journal of mechanical science & technology, 29, 3043-3058.
Katibeh, H., & Aalianvari, A. (2012). Common Approximations to the water inflow into Tunnels. Drainage systems, 75-88.
Liang, Q., Zhang, D., Coppola, G., Mao, J., Sun, W., Wang, Y., & Ge, Y. (2016). Design & analysis of a sensor system for cutting force measurement in machining processes. Sensors, 16(1), 70.
Lin, L., Xia, Y., & Wu, D. (2019). Multiobjective optimization design for structural parameters of TBM disc cutter rings based on FAHP & sampga. Advances in Civil Engineering, 2019.
Liu, W., Li, A., & Liu, C. (2022). Multi-objective optimization control for tunnel boring machine performance improvement under uncertainty. Automation in Construction, 139, 104310.
Mazaira, A., & Konicek, P. (2015). Intense rockburst impacts in deep underground construction & their prevention. Canadian Geotechnical Journal, 52(10), 1426-1439.
Mirjalili, S., Mirjalili, S. M., & Lewis, A. (2014). Grey wolf optimizer. Advances in engineering software, 69, 46-61.
Rostami, J. (1997). Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling & physical measurement of crushed zone pressure (Vol. 38, pp. 56-64). Golden, CO, USA: Colorado School of Mines.
Rostami, J. (2008). Hard rock TBM cutterhead modeling for design & performance prediction. Geomechanik und Tunnelbau: Geomechanik und Tunnelbau, 1(1), 18-28.
Rostami, J., Ozdemir, L., & Nilson, B. (1996, May). Comparison between CSM & NTH hard rock TBM performance prediction models. In Proceedings of Annual Technical Meeting of the Institute of Shaft Drilling Technology, Las Vegas (pp. 1-10).
Sun, H. Y., Guo, W., Liu, J. Q., Song, L. W., & Liu, X. Q. (2018). Layout design for disc cutters based on analysis of TBM cutter-head structure. Journal of Central South University, 25(4), 812-830.
Sun, W., Ling, J., Huo, J., Guo, L., Zhang, X., & Deng, L. (2013). Dynamic characteristics study with multidegree-of-freedom coupling in TBM cutterhead system based on complex factors. Mathematical Problems in Engineering, 2013.
Yang, M., Xia, Y. M., Lin, L. K., Qiao, S., & Ji, Z. Y. (2020). Optimal design for buckets layout based on muck removal analysis of TBM cutterhead. Journal of Central South University, 27(6), 1729-1741.
Zhao-Huang, Z., & Yong-Li, Q. (2011). Research on the layout of TBM disc cutter. Engineering mechanics, 28(5), 172-177.