Alebouyeh, A., Dehghan, A. N., Goshtasbi, K. (2019). Identifying the geological hazards during mechanized tunneling in urban areas – the case of Tehran alluvium conditions. In Tunnels and Underground Cities. Engineering and Innovation Meet Archaeology, Architecture and Art (pp. 5264-5274). CRC Press.
Avanaki, M. J., & Dehghan, A. N. (2019). Seismic performance of steel fiber reinforced concrete segmented lining tunnels. In Tunnels and Underground Cities. Engineering and Innovation Meet Archaeology, Architecture and Art (pp. 5685-5691). CRC Press.
Avunduk, E., & Copur, H. (2018). Empirical modeling for predicting excavation performance of EPB TBM based on soil properties. Tunnelling and Underground Space Technology, 71, 340-353.
Bezuijen, A., & Talmon, A. M. (2014). Soil pressures at the cutting wheel and the pressure bulkhead of an EPB-shield. In 8th International symposium on Geotechnical Aspects of Underground Construction in Soft Ground (IS-Seoul) (pp. 523-529). CRC Press.
Castellanza, R., Betti, D., & Lambrughi, A. (2008). Three-dimensional numerical models for mechanised excavations in urban areas. In Jornada tecnica tuneles con EPB (pp. 105-128).
Chakeri, H., Ozcelik, Y., Unver, B. (2013). Effects of important factors on surface settlement prediction for metro tunnel excavated by EPB. Tunn Undergr Space Technol, 36, pp 14–23.
Dehghan, A. N., Shafiee, S. M., & Rezaei, F. (2012). 3-D stability analysis and design of the primary support of Karaj metro tunnel: Based on convergence data and back analysis algorithm. Engineering geology, 141, 141-149.
Fang, Y., He, C., Nazem, A., Yao, Z., & Grasmick, J. (2017). Surface settlement prediction for EPB shield tunneling in sandy ground. KSCE Journal of Civil Engineering, 21(7), 2908-2918.
Guglielmetti, V., Grasso, P., Mahtab, A., & Xu, S. (2008). Mechanized tunnelling in urban areas: design methodology and construction control. CRC Press.
Grasmick, J., Rysdahl, B., Mooney, M. A., Robinson, B., Prantil, E., & Thompson, A. (2015). Evaluation of slurry TBM design support pressures using east side access Queens bored tunnels data. In Rapid Excavation and Tunneling Conference (RETC).
Goh, A. T. C., Zhang, W., Zhang, Y., Xiao, Y., & Xiang, Y. (2018). Determination of earth pressure balance tunnel-related maximum surface settlement: a multivariate adaptive regression splines approach. Bulletin of Engineering Geology and the Environment, 77(2), 489-500.
Kavvadas, M., Litsas, D., Vazaios, I., & Fortsakis, P. (2017). Development of a 3D finite element model for shield EPB tunnelling. Tunnelling and Underground Space Technology, 65, 22-34.
Karamniayi Far M., Dehghan A.N., (2019). The Effect of Pre-Support System (Forepoling) on the Control of Ground Surface Subsidence caused by SEM/NATM in Shallow Urban Road Tunnels under Railway Traffic Loading. Tunneling & Underground Space Engineering (TUSE), 7(2), 63-85.
Leca E., New B., (2007). "Settlements induced by tunneling in soft ground", Tunnelling and Underground Space Technology, 22 (2) 119-149.
Lai, H., Zhao, X., Kang, Z., & Chen, R. (2017). A new method for predicting ground settlement caused by twin-tunneling under-crossing an existing tunnel. Environmental Earth Sciences, 76(21), 726.
Mooney, M. A., Grasmick, J., Kenneally, B., & Fang, Y. (2016). The role of slurry TBM parameters on ground deformation: Field results and computational modelling. Tunnelling and Underground Space Technology, 57, 257-264.
Mori, L., Mooney, M., & Cha, M. (2018). Characterizing the influence of stress on foam conditioned sand for EPB tunneling. Tunnelling and Underground Space Technology, 71, 454-465.
Sadeghi, M., Pourhashemi, S. M., Dehghan, A. N., & Ahangari, K. (2016). The Effect of Excavation Progress on the Behavior of Hakim Highway Tunnel Using Geotechnical Instrumentation. In ITA-AITES World Tunnel Congress (pp. 22-28).
Wood, A. M. (1975). The circular tunnel in elastic ground. Geotechnique, 25(1), 115-127.