Asadollahpour, E., Rahmannejad, R., & Asghari, A. (2011). Tunnel wall convergence prediction in rock mass with time dependent behavior (Case study: Babolak Water Conveyance Tunnel). Presented at the first international and third national conference on dams and hydropower, Tehran, Iran.
Carranza-Torres, C. (2009). Analytical and numerical study of the mechanics of rock bolt reinforcement around tunnels in rock masses. Rock Mechanics and Rock Engineering, 42(2), 175–228.
Cristescu, N., & Hunsche, U. (1998). Time effects in rock mechanics. New York: Wiley.
Grosic, M. (2014). Time dependent Deformation of Flysch Rock Mass, Doctoral Thesis, university of Rijeka, Faculty of civil engineering.
Itasca Consulting Group Inc. (2013). FLAC3D manual, Version 5.01, Minnesota USA.
Khosravi, Saeed. (2011, April). Determination of time dependent behavior parameters of rock mass and stability analysis using direct strain control method. Master of Science Thesis, Shahid Bahonar university of Kerman.
Mahab Ghodss consulting engineering co. (2011). Rock mechanic studies and designs report in Azad powerhouse cavern.
Nadimi, S., Shahriar, K., Sharifzadeh, M., & Moarefvand, P. (2011). Triaxial creep tests and back analysis of time-dependent behavior of Siah Bisheh cavern by 3-Dimensional Distinct Element Method. Tunneling and Underground Space Technology, 26(1), 155–162.
Radoncic, N., Schubert, W., & Moritz, B. (2009). Ductile support design. Zur Auslegung duktiler Ausbauten. Geomechanik Und Tunnelbau, 2(5), 561–577.
Schubert, W. (2008). Design of Ductile Tunnel Linings. Presented at the 42nd U.S. Rock Mechanics Symposium (USRMS), American Rock Mechanics Association.
Sharifzadeh, M., Tarifard, A., & Moridi, M. A. (2013). Time-dependent behavior of tunnel lining in weak rock mass based on displacement back analysis method. Tunneling and Underground Space Technology, 38, 348–356.