<ArticleTitle>Preliminary Construction Cost Estimation for Short Tunnels in Fair to Good Rock Mass Conditions</ArticleTitle>
<VernacularTitle>برآورد مقدماتی هزینه‌های ساخت تونل‌های کوتاه راه در محیط‌های سنگی با کیفیت متوسط تا خوب</VernacularTitle>
			<FirstPage>77</FirstPage>
			<LastPage>85</LastPage>
			<ELocationID EIdType="pii">443</ELocationID>
			
<ELocationID EIdType="doi">10.22044/tuse.2014.443</ELocationID>
			
			<Language>FA</Language>
<AuthorList>
<Author>
					<FirstName>میثم</FirstName>
					<LastName>نجف زاده</LastName>
<Affiliation>دانشجوی کارشناسی‌ارشد مهندسی استخراج معدن؛ گرایش بررسی‌های فنی و اقتصادی؛ دانشگاه تربیت مدرس</Affiliation>

</Author>
<Author>
					<FirstName>احمد رضا</FirstName>
					<LastName>صیادی</LastName>
<Affiliation>دانشیار؛ گروه مهندسی معدن؛ دانشکده‌ی فنی و مهندسی؛ دانشگاه تربیت مدرس</Affiliation>

</Author>
<Author>
					<FirstName>جعفر</FirstName>
					<LastName>خادمی حمیدی</LastName>
<Affiliation>استادیار؛ گروه مهندسی معدن؛ دانشکده‌ی فنی و مهندسی؛ دانشگاه تربیت مدرس</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2013</Year>
					<Month>05</Month>
					<Day>05</Day>
				</PubDate>
			</History>
		<Abstract>Cost estimation is one of the most critical tasks in pre-feasibility studies and planning of tunnel construction projects. This paper presented a cost estimation model for excavation and support of short tunnels using uni-variate (UVR) and multi-variate regression (MVR) techniques. Hence, a database consisting of two explanatory variables including RMR and tunnel depth along with tunnel support and excavation costs was compiled from 12 tunnel sections in the North-West of Iran. The statistical significance and validity of the obtained models was checked by using some statistical tests, which proved that this model provides the possibility of a fast and adequate cost estimation of the excavation as well as support cost of tunnels at the phase of pre-feasibility study in tunnel projects.
 
Introduction
In this research, the main purpose is to provide a reliable early cost estimating model for short tunnels which are constructed by drilling and blasting method. The structure of the proposed model is dependent on previous experiences in cost modeling as well as statistical considerations of data and the results of validation functions.
 
Methodology and Approaches
In this research, both uni-variable and multi-variable regression techniques were implemented because of their mathematical background and their wide applications in cost estimations.
 
Results and Conclusions
Based on the obtained results, among the three possible uni-variate functions, the form of Y=ae&lt;sup&gt;bx&lt;/sup&gt;, with a mean absolute error rate of 13% is better than others for estimation of the tunneling cost. The results showed that the costs of excavation increase with RMR. In addition, the cost of tunnel excavation showed a reverse relation with RMR. Linear, logarithmic and exponential regression techniques were applied for multi-variate modeling and it was concluded that only the linear regression model is significant. Validation of the model using MAER method indicated that the error changed in 11 to 13 percent provides an acceptable range in pre-feasibility study phase.</Abstract>
			<OtherAbstract Language="FA">مدل­های تخمین هزینه از جمله ابزارهای مهم در به‌روزرسانی اطلاعات اقتصادی، انجام مطالعات امکان­سنجی، بودجه­بندی و تامین منابع مالی پروژه­های ساخت است. در این تحقیق مدلی برای برآورد مقدماتی هزینه‌ی عملیات ساخت تونل­های کوتاه راه به روش حفر چالزنی-انفجار با استفاده از تحلیل رگرسیون تک و چند متغیره به عنوان یکی از پرکاربردترین روش‌های پارامتریک، ارائه شده است. بدین منظور از داده­های 12 مقطع از تونل­های راه شمال غرب کشور استفاده شده است. مدل‌سازی تک متغیره با متغیر توضیحی RMR نشان داده است از میان توابع مختلف، تابع نمایی با حداقل نرخ خطای مطلق 13 درصد بهتر از سایر توابع است. مدل­سازی چند متغیره با در نظر گرفتن شاخص رده­بندی توده‌سنگ RMR و ارتفاع روباره به عنوان متغیرهای مستقل نیز نشان داده است تنها مدل­ رگرسیونی خطی معنادار بوده و با حد­اقل نرخ خطای مطلق تقریبی11 درصد از اعتبار مناسبی برخوردار است.</OtherAbstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">تونل‌های کوتاه راه</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">برآورد هزینه</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">تحلیل رگرسیون</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">ارتفاع روباره</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">RMR</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://tuse.shahroodut.ac.ir/article_443_011f39213457e97ce76d9621c2f538d7.pdf</ArchiveCopySource>
</Article>
</ArticleSet>